Inspection Contents before Commission of Water Reuse Equipment_Zhejiang Xinwei Environmental Protection Equipment

ag旗舰厅

Inspection Contents before Commission of Water Reuse Equipment

  • Zhejiang Xinwei Environmental Protection Equipment
  • 2022-10-29
Here is a brief introduction to the contents of the inspection before the test run of the integrated reclaimed water reuse equipment, hoping to be of some help to everyone.1. The operator shall check...

Here is a brief introduction to the contents of the inspection before the test run of the integrated reclaimed water reuse equipment, hoping to be of some help to everyone.


1. The operator shall check the fastening of the nut on the bolt, the machine base and the connecting bolt of the fan base.


2. Check the lubrication of bearings of integrated reclaimed water reuse equipment and the fastening of bearing bolts.


3. Check whether the axial sealing packing (packing) is pressed tightly and check whether the pipeline leading to the water sealing ring in the shaft seal is radially connected.


Integrated reclaimed water reuse equipment


4, need to prepare tools and materials for maintenance. When the amount of water is insufficient or the capacity of the part receiving water is limited, the adjustment plan shall be negotiated with the relevant departments to obtain agreement for normal and continuous trial operation. When the mine water pump is in a trial run, special attention should be paid to prevent floating objects in the water tank from sucking into the pump and damaging the impeller.


5. Check all auxiliary pressure gauges of integrated reclaimed water reuse equipment. Safety protection devices and electronic control devices should be sensitive, accurate and reliable.



Tags :
ag旗舰厅